Entrusted by the transferor (the Sellers), we have scheduled to hold a public bidding online (www.shipbid.net) from 10:00 to 10:30 (Beijing time) on July 19th, 2023.
1. Bidding Object
Name:AN JIE LI 3, Bulk Carrier
Class: ZC
PoR: Taizhou, China
Trading Area: offshore A1 + A2;
LOA 138.80m/ Breadth 18.80m/ Depth 9.60m
GT/NT: 7289/4081
DWCC: 10600t on 7.15m Draft
M/E: Guangzhou Diesel 8320ZCd-8 2206kW×1set
Built Time: June 4th, 2009
Builder: Zhejiang Fangyuan Ship Industry Co., Ltd, China.
(Data and relevant information provided in this announcement are for reference only)
2. Bidding rules
2.1 This bidding will be held without a reserved price. If there is only one bidder participating in the bidding, the potential transfer of the Ship will be confirmed automatically after the bidding period. If there are two or more bidders participating in the bidding, the potential transfer of the Ship will be carried out by auction. No one has the preemptive right to the transfer of the Ship.
2.2 The starting price is RMB11.70 million, and the bidding deposit is RMB1.2million (or USD 0.18 million). Bid increment is a multiple of RMB 0.02 million.
2.3 The bidding time will enter into Extension Cycle since 10:25 on July 19th, 2023 (Beijing Time) on the bidding day after the bidding officially starts. And then the ending time will be refreshed to 5 minutes once each new bidding price offered.
2.4 The Buyers shall sign an "Export Agency Agreement" with the designated agency company of the bidding company within 2 working days after the bidding is completed, and the bidding deposit shall automatically be converted into the ship purchase deposit under the MOA.
2.5 The time of this auction activity shall be subject to Beijing time (unless otherwise expressly stated).
3. Registration Requirements
3.1 Registration is available from the date of this Announcement and ends before the auction starts on the bidding day (subject to the receipt of bidding deposit, the completion of online registration on the platform and the receipt of the bidding number. It is recommended that bidders pay the deposit 1-2 days in advance in order to avoid any issues). No registration will be accepted after the deadline. After successful registration, the bidder shall be deemed to have fully known, accepted and complied with the contents of this announcement, bidding rules, special provisions and relevant agreements.
3.2 Any natural persons with full civil capacity in China and any corporation or organization in and outside the Peoples Republic of China with legally existing may participate in this bidding.
3.3 The bidder shall submit the following documents for registration (including but not limited to):
(1) For Chinese Bidders:
● 营业执照扫描件(加盖公章)
● 法定代表人身份证扫描件(加盖公章)
● 经办人身份证扫描件及授权委托书(如有,需加盖公章)
● 《参拍承诺书》
● 竞拍保证金付款凭证
(2) For Abroad Bidders:
● Certificate of Incorporation
● Articles of Incorporation
● Copy of Director’s Passport
● Undertaking for Bidding
● Bank slip of bidding deposit
4. Date and Place for Inspection of the Vessel
Inspection place is San Men Wan Anchorage, Potential bidders can inspect the Vessel within the stipulated time. The risk and expenses in relation to the inspection shall be borne by the potential bidders. The bidding company and the Sellers shall only be responsible for coordination work. Potential bidders who fail to participate in the on-site inspection yet complete the registration procedure within the prescribed inspection time shall be deemed to have recognized and accepted the status quo and defects of the Vessel, including but not limited to all known and unknown defects related to the vessel certificates and the vessel condition, etc. Potential bidders shall not object to defects, such as the quality, of the Vessel for any reason.
5. Account of Bidding Company
(1) RMB ACCOUNT:
l 户名:舟山易舸船舶拍卖有限公司
l 账号:3309040160000372900
l 银行:杭州银行舟山分行
(2) USD ACCOUNT:
l Beneficiary: Ningbo Shipping Exchange Market Co, Ltd.
l Beneficiary Address: Room 702, 7th Floor Building 1,No.5 Xing Ye 1st Road Bonded Zone Ningbo City, China
l Account No.: 3309040160000036919
l SWIFT (Beneficiary Bank): HZCBCN2H
l Beneficiary Bank: Bank of Hangzhou Co, Ltd. Zhoushan
l Beneficiary Bank Address: No.619, Dingshen Road, Ganghang building B zone Zhoushan city, Zhejiang Prov. PR China
l Remittance Reference: AN JIE LI 3
6. Contacts
Mr. Zhou: +86 18058087036/ 0580-2038333
Mr. Chen: +86 18058087030/ 0580-2027516
E-mail: auction@shipbid.net
Zhejiang Shipping Exchange Co., Ltd.
Zhoushan Yi Ge Ship Auction Co., Ltd
June 30th, 2023
Article 1 Bidding Rules is made by relevant laws, regulations and policies of the People's Republic of China and with Shipbid practical situations, to standardize the bidding behaviors, maintain an open, fair and equal transaction order, and protect legitimate rights and interests for all the parties involved.
Article 2 The Transaction Rules of the ship bidding (hereafter to be referred as bidding) is suitable for standardizing all the online bidding behaviors. All the parties involved should abide by the Rules and bear legal responsibilities for their own behaviors.Disputes, if any, shall be settled by the parties through friendly negotiation. If the negotiation fails,parties concerned may file a lawsuit with the people's court where the auction organizer (Zhejiang Ship Exchange Market Co.,Ltd) is located.
Article 3 All legal persons or organizations that exist legally can participate in the bidding only if they have the qualifications of the auction announcement except those provided by laws and regulations.
Article 4 The auction information including videos, pictures and written introductions offered by the Seller will be uploaded through the Shipbid system after verified by the auctioneer.
The Seller shall take all the legal responsibilities and economic losses if he provides with fake information.
Article 5 The bidders couldn’t participate in the bidding activities until they register as the buyers through the Shipbid system.
The username and passwords should be kept safely. If forgotten, bidders could retrieve through the Shipbid system. And if divulged, bidders should login in time to change the passwords.
Article 6 Before submitting the application for the bidding, the bidders should carefully read the auction announcement, ship’s information, transaction rules and other relevant documents, then login the Shipbid system to fill in true and effective information as required.
Article 7 The bidders should submit the applications in accordance with the auction announcement before the Shipbid starts.If legal personalities, natural persons and other organizations need joint-bidding, they should fill in related information and the proportion of capital contribution of each party as required and sign the Joint Bidding Statement.
Article 8 The bidders apply on the Shipbid system by themselves, and pay the deposit either on line or offline. One deposit is only for one lot. And if the bidders want to bid several ships at the same time, corresponding deposits are required.
The bidders are entitled to bid only if the deposit fully paid to the nominated account (based on the arrival time of the deposit )within the required time. The bidders shall not be eligible for bidding if the deposit is delayed or not fully paid on time.
Article 9 The bidding shall be conducted with time limit. Qualified bidders can participate in the bidding. The initial offer shall not be lower than the starting price and each offer shall be no less than the specified bid increment.
If it is an auction with reserve price, “YES” will be revealed in the system. Otherwise it will display “NULL”.
Article 10 The bidder shall make a cautious bid, and the offer will be irrevocable once submitted.
Article 11 The last limited time of the Shipbid is FIVE (5) minutes. If there is a new bid within 5 minutes countdown, another 5 minutes will be set.
No new offers would be accepted after the final countdown, and the bidding history will be revealed.
Article 12 Once there is/are (a) bidder offer(s) in the Shipbid, the target bidder (hereinafter called the Buyer) shall be confirmed in accordance with the following rules
(1) Where there is no reserve price, the highest bidder would be the Buyer.
(2)Where there is a reserve price, the bidder with the highest offer and not lower than the reserve price would be the Buyer; If the highest offer is lower than the reserve price, the bidding will be pass.
When the time for the bidding is over, the bidding system will be automatically closed.
Article 13 The Buyer should confirm his qualification with the enterprise or individual valid certification to the auctioneer within 2 working days after the bidding. After verification and confirmation, the Buyer should sign the Purchase Confirmation. If the buyer fails to sign the Auction Transaction Confirmation for reasons, the auction result shall not be affected.
If the buyer fails to pass the qualification due to submitting false registration materials, the bidding result is invalid or the buyer breaches the contract, he shall pay the bidding service fee of both the buyers and the sellers; If the price of the re-auction is lower than the transaction amount, the buyer must make up the difference.
Article 14 If the Buyers do not pay the balance of Purchase Price within the prescribed time or do not take the bidding object, the Sellers are entitled to bid again of which the original Buyers cannot partiticate. If the Buyers regret to bid after completion of the auction (including but not limited to failure to pay the balance Purchase Price 2 working days prior to delivery, or other circumstances the original Buyers express clearly ), the bidding deposit lodged shall not be refunded, and will be used to pay the cost loss caused by the first bidding, make up the difference between the re-bidding price and the first bidding price. If the deposit amount is insufficient cover the costs, the Sellers have the right to pursue recourse against the original Buyers.
Article 15 The payment of balance shall be remitted to the nominated account in time according to the Purchase Confirmation.
Article 16 The Buyer should sign the Sale and Purchase Contract by the Purchase Confirmation with the seller within the required time and make relevant transaction procedures.
Article 17 After paying the balance, the Buyer himself should handover the lot and manage the transaction procedures in time. If the Buyer fails to manage within required time, he himself should pay the costs caused by the delay and afford the consequences of possible damage or losses.
Article 18 The Buyer himself should register the lot and bear all relevant expenses occurred according to the regulations and policies during the transaction procedures.
Article 19 The bidding currency is CNY. Both the starting price and purchase price do not include the expenses and taxes occurred during transaction procedures.
Article 20 If the bidder obstruct others to bid, manipulate or monopoly the bidding price, or make malicious collusion, the auction will be cancelled once above behaviors are found, and relevant legal responsibility will be borne by the bidder.
Article 21 If the bidder cannot normally login the Shipbid system to apply, offer or bid because of following reasons such as virus invasion, hardware failure, network congestion or passwords forgotten and divulge, etc., he himself should bear the consequences and the bidding will not be suspended.
Article 22 The auctioneer reserves the right to suspend or withdraw the bidding before it starts according to the laws and regulations.
Article 23 The auctioneer reserves the right to suspend or withdraw the bidding if force majeure or accident has caused the online auction to fail.
Article 24 The seller and the auctioneer shall not bear any responsibility for the abnormal service of the website or the interruption of the auction activity due to force majeure or any third party. After that, the auctioneer will issue a supplementary announcement and explain the reasons for the interruption. A new auction announcement will be issued 阿as soon as possible the website service returns to normal, and the online auction will be organized and completed according to the new auction announcement. The starting price and reserve price (if any) for re-organizing the bidding due to the above reasons shall be consistent with the original announcement.
Article 25 These rules are general rules for online auction transactions of ships. In case of any conflict with the announcement or agreement of a single item, the terms of a single item shall prevail.
Article 26 If the bidding announcement, additional provision, inspection report or technical status report of the subject object is described and publicized in Chinese and English (or other languages), in case of contradiction or inconsistency, The Chinese version shall prevail.
Article 27 If the person with the right of preemption participates in the bidding, he/she shall submit legal and effective certificates to the auctioneer before the auction begins. After the auctioneer confirms the qualification, he/she can obtain the right of preemption to participate in the bidding. If he/she fails to submit within the time limit, he/she shall be deemed to have given up the right of preemption of the subject matter.
Article 28 The time concerned in the bidding all depends on Shipbid system service time, except the deposit arriving time which depending on the bank recording time. All the time of information arriving is subject to the time when the information received by Shipbid.
Zhejiang Shipping Exchange Co Ltd is responsible for the interpretation of the Rules.
窗体顶端
1. This additional provision is a supplement to the bidding announcement and rules, which has the same legal effect.
2. Bidding Object
Name: AN JIE LI 3, Bulk Carrier
Class: ZC
PoR: Taizhou, China
Trading Area: offshore A1 + A2
LOA 138.80m/ Breadth 18.80m/ Depth 9.60m
GT/NT: 7289/4081
DWCC: 10600t on 7.15m Draft
M/E: Guangzhou Diesel 8320ZCd-8 2206kW×1set
Built Time: June 4th, 2009
Builder: Zhejiang Fangyuan Ship Industry Co., Ltd, China.
All the information and data provided in the Bidding Announcement, Special Provision, Technical Report as well as any other channel related to the Ship are for reference only. The bidding object is subject to the status at the time of inspection. If there is any discrepancy between the actual situation and the information and data above shall not affect the bidding and bidding price. Once the bidding is concluded, the Sellers and us shall not assume take any liability for defects or quality problems of the bidding ship.
3. After Bidding
3.1 After a successful bidding, the Buyers shall sign an Auction Confirmation with the Bidding Company on the same day (the “Bidding Day”) via email address or facsimile. The Buyers shall sign an original Auction Confirmation with the Bidding Company within two (2) banking days of the Bidding Day. The Buyers shall sign the MOA with the Sellers within five (5) banking days after completion of the bidding. Escrow Agreement shall be signed by three parties on the same day of signing MOA.
3.2 After signing of the MOA and the escrow agreement,the bidding deposit paid by the Buyers shall be automatically converted into the purchase deposit under the MOA.
3.3 The bidding deposits of the unsuccessful bidders shall be returned within two (2) Banking Days after the bidding without interests.
3.4 It’s acknowledged the CNY or USD account designated by the bidding company is the escrow account for the Buyers and Sellers to hold and release the funds of the Purchase Price. We shall, within 3 banking days after receiving the cancellation certificate of the transferor, release all the Purchase Price, ROB Charges and other payables received by the Buyers. The bidding company does not charge any additional fees for the fund custody services related to this project, and all the custody funds are free of interest.
3.5 窗体顶端
3.5 The Purchase Price shall be settled in CNY. If the Buyers are of an overseas enterprise, the Buyers shall entrust the export agent nominated by the bidding company for exporting matters, and the export-related expenses shall be borne by the Buyers. The Buyers shall pay the USD price in full and on time according to the bidding price, and the agent company shall handle the bank exchange settlement one working day after the day of delivery (The exchange rate shall refer to the bank's real-time spot exchange purchase price, and the final settlement slip issued by the bank shall prevail)
4. Transfer (Deletion) and Delivery of the Ship
4.1 The Buyers shall pay all the bidding service fee not later than 16:00 July 21st, 2023 (Beijing Time), and remit the balance of the purchase price, estimated ROB charge and other payables (if any) to the escrow account two (2) banking days prior to the Vessel’s expected delivery date. Any delay or failure to pay fees mentioned above shall be deemed as a breach of the Bidding Announcement and the MOA.
4.2 The original owner (as the Sellers) should complete all the deletion procedures relating to the ship within 10 banking days after signing/receiving the original PODA and other delivery documents.
Notice of Readiness shall not be tendered before: July 26th, 2023
The Latest Delivery Date: Aug 10th, 2023
If the Delivery indeed has to be postponed due to force majeure factors, a new Latest Delivery Date should be mutually agreed by the Sellers and the Buyers.
4.3 Delivery Place: San Men Wan Anchorage,Taizhou,China, at the Sellers’ option.
The Sellers are not responsible for any time and cost for Buyers to take delivery of the Ship which shall be for the Buyers’ account.
The Buyers shall take the vessel “as is where is” at the time of inspection.The Buyers shall be deemed to confirm and accept the ship’s condition if they did not inspect the ship at the nominated time within the prescribed inspection time. If the Buyers have completed the registration procedures and participated in the bidding, it shall be deemed to have fully understood and accept all the information of the subject matter of the bid, including but not limited to all known and unknown defects related to the ship certificate, ship condition, etc. The Buyers shall not raise objections to the defects such as the quality of the bid target for any reason.
5. Related Expenses
5.1 Bidding service fee: After the bidding, the Buyers shall pay the bidding company 1% of the purchase price as bidding service fee.
5.2 The bank charges related to the bidding deposit shall be borne by the bidders; and the bank charges related to the purchase price shall be borne by the Buyers.
5.3 The Sellers shall provide the Buyers with commercial invoices of the purchase price and remaining bunkers. Any costs and taxes of re-registry shall be borne by the Buyers.
5.4 The purchase price refers to the subject Vessel only. The Buyers shall pay for remaining oil on board and hired items/crew personal belongings (if any) are excluded. On delivery, the Buyers and the Sellers shall take measurement of the remaining fuel oils, bunkers and unused lubricating The Buyers shall take over remaining bunkers and unused lubricating and hydraulic oils and grease in storage tanks and unopened drums and pay with the last actual net price (exclude barging expenses) as evidenced by invoices or vouchers; or if the invoices or vouchers are not available, the Platts Sinopec price on the delivery place on the two (2) business days prior to the date of delivery to be applied.
5.5 The Vessel with everything belonging to her shall be at the Sellers' risk and expense until she is delivered to the Buyers, while the Vessel’s risk and expenses shall be for the Buyers’ account after signing Protocol of Delivery and Acceptance under this Agreement. If there are other agreements in the MOA, the agreement in the MOA signed by the Buyers and Sellers shall prevail.
6. This Announcement is described in both Chinese and English. In case of any discrepancy between the two languages, Chinese version shall prevail.
7. Matters not covered herein shall be settled through negotiation by the bidding company, the Sellers and the Buyers.
Zhejiang Shipping Exchange Co., Ltd.
Zhoushan Yi Ge Ship Auction Co., Ltd.
June 30th, 2023
窗体底端